Projection Picking system
It is a picking system that can be flexibly constructed according to various shapes of shelves and racks by applying image processing technology. It is also equipped with a Pokayoke function to support picking work at factory assembly lines and distribution centers. It can be installed in places where the display could not be installed.
Feature
Can be installed on any shelfEquipped with Pokayoke function (cannot proceed until correct work is done) No electrical work required (simple equipment configuration makes installation and change easy) Various picking instructions can be given by product name, quantity, product image, video, audio, etc.It is also possible to operate in cooperation with various logistics-related equipment such as conveyors.
